Key Dates 2025 :: Submissions and Shows

15th May | BA Architecture TWO Submission – EC

21st May | MA Architecture Year FOUR FIVE | Submission- EC 

21st May | BA Architecture Year THREE | Submission (10.00 – 11.00)- EC

15th/16th | May – Studios 1001-1006 work cleared to collection area A (bottom of 11_1003)

19th – 23rd | CONTRACTORS Fit out STUDIOS 1001-1006

22nd/23rd | All remaining studios work cleared to collection area B (bottom of crit pit)

26 – 30th | CONTRACTORS Fit out STUDIOS 1010-1020

26th May | Bank Holiday

27th May | Plotter Move

6th June | All work still remaining in collection areas A and B to be recycled

Any portfolios to be moved to racks in computer areas

27th May | Student Install – Media / Animation

2nd June | Student Install – Graphics / Music+Sound

3rd June | Student Install – Architecture / Landscape Architecture

9th June | Plot Slam – Bring final drawings, as PDFs, checked and correctly sized for printing by Tech Team (no test-prints or mistake / reprints – final drawings only).

12th June | | | | 6.00PM Graduate Show Opening

16th June – 19t|h | Landscape Summer School / Plot Area

28th June | Show closes

Monday 30th June | Students take down and collect work

Monday 7th July | All remaining work taken down and stored in collection areas

Monday 7th July | Any portfolios remaining to be moved to portfolio rack beside 1019

7th July – 11th | Summer School / 1019

22nd August | All work still remaining in collection area to be disposed / recycled (not portfolios)

8th September | Welcome Week

22nd September| Autumn Term Starts