Restoring Dreadnought

To mark the start of restoration of the Dreadnought the Archive Display Cases in the basement of Stockwell Street Library contain two sets of archival records:

The first shows architects’ plans from April and September 1993 to create an Administration and Conference Centre; the April scheme suggests a hall in the NW corner of the Dreadnought (damaged by bombing in WWII), the September scheme a hall in an extension to the Stephen Lawrence Building.

Neither scheme was adopted as the ORNC became available and it was decided to make the Dreadnought into the University Library instead. The second case contains photographs of the restoration work which didn’t begin until August 19th 1997.

Below are more images from the same collection, along with descriptions and images by Dannatt, Johnson Architects showing the final plans and end results.

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *